Gra 078 Complete Plan of Lifting
GRA.078- Complete Plan of Lifting Operations
Project
- None -
Site A
Site B
Site C
Site D
Site E
Area
Details of Lift
Details of Load
Work Details
Dimensions of load
Weight of load + factor of safety
Max height of lift
Max working radius
Jib length required
Total Weight
Special requirements
Crane Set Up Details
Type of crane with configuration
Operators Certification - (Check)
Will Outriggers/tracks be on concrete, soil or stone?
Will Outriggers/tracks be next to an excavation?
Are any underground services located under outrigger/tracks?
Is there any overhead services/structures?
Are the crane operator & banksman out of sight of each other?
Means of communication
Is the access route suitable and are there any restrictions?
Any other restrictions?
Rigging Arrangements
SWL at configuration and lifting radius?
Is there any eccentricity of the load that will present rigging difficulties?
Is the lifting tackle of sufficient capacity? (Including any reductions in capacity for sling angles and choking back onto the sling arrangements)
Is the access safe to attach lifting tackle?
Are there any lifting points that are attached to the load that are damaged or in poor condition?
Sketch of Lifting Arrangements
One file only.
20 MB limit.
Allowed types: gif, jpg, jpeg, png.
Lifting Equipment Schedule
Lifting Equipment
Re-order
Item of lifting equipment
Number required
SWL
Weight
Operations
Item of lifting equipment
Number required
SWL
Item weight
Add more items
more items
Sign off
Completed By
Signature
Sign above
Position
Checked By
Signature
Sign above
Position
If there are any doubts then advice must be sought from the ‘Appointed Person’ for lifting operations.